Analysis of Reducing Loss Time in The Stamping Process in The AIDA 800 T Blanking Machine at PT. XYZ

  • Ibnu Nur Rohman Universitas Singaperbangsa Karawang
  • Reza Setiawan Universitas Singaperbangsa Karawang
  • Iwan Nugraha Gusniar Universitas Singaperbangsa Karawang
Abstract views: 261 , pdf downloads: 623
Keywords: losstime, Aida 800 T machine, cost reduction

Abstract

In a production process optimization is needed to increase the productivity of production results. This research was conducted on the Aida 800T Blanking machine, based on the results of field observations made on the Aida 800T Blanking machine at PT. XYZ there is frequent losstime, this hinders the production process which results in reduced production targets. Losstime often occurs during a production process, the factors that often occur are the environment, humans, materials, and machines. The purpose of this study is to find out how much the cost is due to loss time. The methods used to perform losstime analysis are 5 why analysis, Pareto diagrams and fishbone diagrams to identify problems that often occur in the production process. From the results of the research, it was found that the costs incurred were Rp. 6,509,220. By performing a losstime analysis, there is a cost saving of 3,797,736 during one month of production, so that the method is successfully used with the end result of doing kaizen.

Downloads

Download data is not yet available.

References

S. D. Andryanto, "apa-itu-revolusi-industri-4-0-dan-society-5-0," TEMPO, 20 Mei 2021. [Online]. Available: https://tekno.tempo.co/apa-itu-revolusi- industri-4-0-dan-society-5-0/.

H. M. & Hasrul hasrul, "Analisa Kinerja Mesin Roughing Stand dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) dan Failure Mode Effect Analysis (FMEA)," Jurnal INTECH, vol. 3, p-ISSN. 2407-781X, 2017.

A. P. Takaria Kevin Leonardo, "Analisa Losstime untuk Meningkatkan Produktivitas pada PT. PMI," Jurnal Titra, vol. 7, no. Losstime Produktivitas, pp. 327-334, 2019.

R. M. Akhlis, "Analisis Proses Blanking dengan Simple Press Tool," Jurnal Rekayasa Mesin, vol. Vol.5, no. Proses Blanking, pp. 85-90, 2014.

D. Anon, "Understanding How to Use The 5-Whys for Root Cause Analysis," vol. 61, no. 5 why analysis, pp. 1-10, 2016.

T. &. K. Muhandri, "Sistem Jaminan Mutu Industri Pangan," Pangan, no. Industri pangan, 2006.

M. Nasution, "Manajemen Mutu Terpadu," Ghalia Indonesia, no. Manajemen Mutu Terpadu, 2004.

T.-C. Scarvada, "A Review of the Causal Mapping Practice and Research Literature," Second World Conference on POM, no. Causal Mapping Practice and Research Literature, 2004.

M. Imai, "Kaizen (Ky'zen) Kunci Sukses Jepang Dalam Persaingan,"PT.Pustaka Binaman Presindo, 2001.

F. &. A. D. Tjiptono, "Total Quality Management," 2001.

P. K. E. Sirine Hani, "Pengendalian Kualitas Menggunakan Metode Six Sigma," AJIE (Asian Journal of Innovation and Entrepreneurship), vol. Vol.02, no. Six Sigma, p. 03, 2017.

S. o. B. S. STORES, "JFS JSH440W JFS A1001," BBN STEEL STORES, 3Maret 2019. [Online]. Available: www.steelstores. [Accessed 18 November 2021].

PlumX Metrics

Published
2023-07-04
How to Cite
[1]
I. N. Rohman, R. Setiawan, and I. N. Gusniar, “Analysis of Reducing Loss Time in The Stamping Process in The AIDA 800 T Blanking Machine at PT. XYZ”, JMN, vol. 6, no. 1, Jul. 2023.