PENERAPAN METODE AGE REPLACEMENT PADA USULAN JADWAL PREVENTIVE MAINTENANCE MESIN DUMP TRUCK DI PT. BSE BAYUNG LENCIR

  • Alfhand Dian Dio Universitas Tridinanti
  • hermanto MZ universitas tridinanti
  • tolu tamalika universitas tridinanti
Abstract views: 450 , PDF downloads: 598
Keywords: Perawatan, Penjadwalan, Metode Age Replacement

Abstract

The mobility of the course of the production process of a mining company will increase if the means of transportation used are better. PT BSE Bayung Lencir as a provider of Dump truck transportation equipment has three fleets, including the Dump trucks of Renault, Scania and Mercy. In the Dump truck fleet there are many that are damaged so that they cannot operate and cause losses, both in terms of repair costs and due to the non-operation of the fleet. The Dump truck brand that experienced the most damage was the Mercy brand with 34 cases. Therefore, it is necessary to plan a preventive maintenance schedule for Dump truck engines so that PT BSE Bayung Lencir's consumer needs can be met and the costs incurred can be kept to a minimum. The stages in the research began with collecting data, analyzing data using the Age Replacement Method. after treatment with the AgeReplacement method, the right treatment time to do is every 24 days at a cost of Rp. 16,726,146, - the cost before determining the treatment time is Rp. 24,500,000, - thus the profit earned is Rp. 7,773,854, - So the company can make savings of 31%.

References

Ansori, Mustajib . (2013). Definisi Perawatan Mesin.
Kurniawan, F . (2013) dalam Ebeling, (1997). Manajemen Perawatan Industri. Yogyakarta: Graha Ilmu.
Purnama, J . (2015) dalam jardine, (1973). Metode Age Relacement Digunakan Untuk Menentukan Interval Waktu Perawatan. Jurnal Institut Teknologi Adhi Tama Surabaya.
Praharsi, (2015). Perancangan Penjadwalan Preventive Replacement. Jurnal Ilmiah Teknik Industri, Vol 14. No 01..
Prawiro, Y .(2015. Penentuan Interval Waktu Perawatan Komponen Kritis, Jurnal Teknik Industri, Vol 16. No 02.
Vidiasari, D .(2015). Interval Waktu Perawatan Pencegahan Optimal Komponen Sistem, Jurnal Teknik Industri Itenas Bandung, Vol 03. No 01.

PlumX Metrics

Published
2023-04-14
How to Cite
Dio, A. D., MZ, hermanto, & tamalika, tolu. (2023). PENERAPAN METODE AGE REPLACEMENT PADA USULAN JADWAL PREVENTIVE MAINTENANCE MESIN DUMP TRUCK DI PT. BSE BAYUNG LENCIR. Nusantara of Engineering (NOE), 6(1), 57 - 65. https://doi.org/10.29407/noe.v6i1.19871