USULAN PERBAIKAN TATA LETAK FASILITAS PABRIK PERALATAN LALU LINTAS DENGAN METODE ARC DAN ARD

  • Bangun Nusantara Universitas Tridinanti
  • Winny Andalia Universitas Tridinanti
  • Irnanda Pratiwi Universitas Tridinanti
Abstract views: 398 , PDF downloads: 560
Keywords: Tata letak fasilitas, ongkos material handling, Activity Relationship Chart, Activity Relationship Diagram (ARD)

Abstract

This study aims to discuss the flow of material movement to produce the layout of the signpost production facility at PT. Sarana Lalu Lintas, to reduce the distance of movement and material handling cost (OMH). The problem faced in the initial layout was the process flow in the production of signs that were not well arranged. The distance between spaces is far apart. Due to the distance between spaces, this has resulted in considerable material handling costs. The Activity Relationship Chart (ARC) and Activity Relationship Diagram (ARD) are carried out based on the degree of proximity between facilities and then a proposed layout is made. A redesign of the layout of the laboratory facilities was carried out to lower the distance of movement and the cost of handling materials. The results of the study using ARC and ARD obtained a decrease in the distance of movement to 1,350 meters and material handling costs (OMH) of Rp2,199,717. Efficiency produced in the proposed layout was 37.16%.

References

Aji, S. N. (2022). Implementasi ARC dan ARD Untuk Menurunkan OMH Pada Desain Ulang Tata Letak Fasilitas Laboratorium. Jurnal Industry Xploer, 127-131.
Al'amin, M. Y. (2020). analisis tata letak fasilitas gudang menggunakan metode activity relationship chart. teknik industri, 29.
Arif, M. (2016). Permodelan Sistem. Jakarta: CV. Budu Utama.
Budiman, E. (2016). Analisis Spasial data jaringan Internet Service Provider di Kecamatan Sungai Pinang Kota Samarinda Berbasis Online . Jurnal Ilmiah ILKOM.
Heizer, J. R. (2017). Opertion Management : Sustainability and Supply Chain Management . Edinburgh: Pearson Education Limited.
Pradana, E., & Nurcahyo, C. B. (2014). Analisis Tata Letak Fasilitas Proyek Menggunakan Activity Relationship Chart dan Multi-Objectives Function pada Proyek Pembangunan Apartemen De Papilo Surabaya. Jurnal Teknik POMITS, 133.
Putri, R. E. (2019). Pengaruh Perancangan Ulang Tata Letak Fasilitas di Area Operational Kerja Berbasis 5S untuk Pengajuan Modal Usaha. Jurnal Dimensi.
Rozak, A., Kristianto, A. D., Raharjo, G. S., & Saleh, N. A. (2021). Penerapan ARC dan ARD untuk Membuat Rancangan Layout Fasilitas pada Pabrik Kerupuk Menggunakan BLOCPLAN Di CV Arto Moro. 146.
Samsu, S. (2013). Analisis Pengakuan dan Pengukuran Pendapatan Berdasarkan PSAK NO.23 pada PT. Misa Utara Manado. Jurnal EMBA.
Wawan Gunawan, H. H. (2021). usulan tata letak fasilitas kampus 1 universitas banten jaya dengan menggunakan metode arc dan ard. jurnal intent, 173.
Winarno, H. (2015). ANALISIS TATA LETAK FASILITAS RUANG FAKULTAS TEKNIK UNIVERSITAS SERANG RAYA DENGAN MENGGUNAKAN METODE ACTIVITY RELATIONSHIP CHART (ARC). 6.

PlumX Metrics

Published
2023-04-14
How to Cite
Nusantara, B., Andalia, W., & Pratiwi, I. (2023). USULAN PERBAIKAN TATA LETAK FASILITAS PABRIK PERALATAN LALU LINTAS DENGAN METODE ARC DAN ARD. Nusantara of Engineering (NOE), 6(1), 37 - 45. https://doi.org/10.29407/noe.v6i1.19862