Software Project Management Systems Using Kanban Method in the CV. Primavisi Globalindo

Authors

  • Muhammad Aliyya Ilmi Universitas Brawijaya
  • Fajar Pradana Universitas Brawijaya
  • Widhy Hayuhardhika Nugraha Putra Universitas Brawijaya

DOI:

https://doi.org/10.29407/intensif.v4i2.14320

Keywords:

Project Management, Kanban, Waterfall, Codeigniter, Website Application

Abstract

Reducing the risk of failure in working on software projects is one of the successes for the company. It can be done by implementing project planning management properly. One important aspect of project management planning is scheduling. Scheduling includes recording human resources and tasks in the project. The Kanban method is one of the methods used to overcome problems in controlling project schedules. This study aims to develop a project scheduling system that applies the Kanban method. In this research, project management and scheduling system will be developed using the Kanban method. This system expected to be able to assist companies in handling projects. Kanban was chosen because it can easily respond to project changes, easily implemented, and company needs. In this study, unit testing was performed on the system's three main features and tested the validity of the system's 49 functional requirements. The usability test produces a value of 76. Based on the validation and usability test results, it can be concluded that the system is included in the acceptable category.

Downloads

Download data is not yet available.

References

I. Pihir and K. Brodar, “Impact of Project Management Education and ICT Usage on Project Success 1 . Project Management Education,” no. March 2008, pp. 1–7, 2008.

B. Hughes and M. Cotterell, “Software Project Management,” Quality Management Journal, vol. 2, no. 1. McGraw-Hill, Berkshire, p. 396, 1999.

Munir, Manajemen Proyek Perangkat Lunak. Bandung: UPI Press, 2015.

R. D. Apriyanto and H. P. Putro, “Tingkat Kegagalan Dan Keberhasilan Proyek Sistem Informasi Di Indonesia,” Semin. Nas. Teknol. Inf. dan Komun. 2018 (SENTIKA 2018), vol. 2018, no. Sentika, pp. 23–24, 2018.

M. Lage Junior and M. Godinho Filho, “Variations of the kanban system: Literature review and classification,” Int. J. Prod. Econ., vol. 125, no. 1, pp. 13–21, 2010.

R. B. Wakode, L. P. Raut, and P. Talmale, “Overview on Kanban Methodology and its Implementation,” IEEE Microw. Mag., vol. 3, no. 2, pp. 2518–2521, 2015.

E. Leybourn, “Lean Kanban Practitioner,” Www.Theagiledirector.Com, no. cc, p. 67.

M. Ikonen, E. Pirinen, F. Fagerholm, P. Kettunen, and P. Abrahamsson, “On the impact of Kanban on software project work: An empirical case study investigation,” Proc. - 2011 16th IEEE Int. Conf. Eng. Complex Comput. Syst. ICECCS 2011, no. April, pp. 305–314, 2011.

E. Corona and F. E. Pani, “A review of Lean-Kanban approaches in the software development,” WSEAS Trans. Inf. Sci. Appl., vol. 10, no. 1, pp. 1–13, 2013.

M. F. Fahat, B. Priyambadha, and F. Pradana, “Pengembangan Aplikasi Manajemen Proyek Perangkat Lunak Berbasis Scrum Studi Kasus CV. Nusantara Media Mandiri (CVNMM),” J. Pengemb. Teknol. Inf. dan Ilmu Komput. Univ. Brawijaya, vol. 2, no. 12, pp. 6627–6634, 2018.

M. Alqudah and R. Razali, “A comparison of scrum and Kanban for identifying their selection factors,” Proc. 2017 6th Int. Conf. Electr. Eng. Informatics Sustain. Soc. Through Digit. Innov. ICEEI 2017, vol. 2017-Novem, no. November, pp. 1–6, 2018.

H. Lei, F. Ganjeizadeh, P. K. Jayachandran, and P. Ozcan, “A statistical analysis of the effects of Scrum and Kanban on software development projects,” Robot. Comput. Integr. Manuf., vol. 43, pp. 59–67, 2017.

J. Puche, J. Costas, B. Ponte, R. Pino, and D. de la Fuente, “The effect of supply chain noise on the financial performance of Kanban and Drum-Buffer-Rope: An agent-based perspective,” Expert Syst. Appl., vol. 120, pp. 87–102, 2019.

V. G. Aguilar-Escobar, S. Bourque, and N. Godino-Gallego, “Hospital kanban system implementation: Evaluating satisfaction of nursing personnel,” Investig. Eur. Dir. y Econ. la Empres., vol. 21, no. 3, pp. 101–110, 2015.

M. O. Ahmad, D. Dennehy, K. Conboy, and M. Oivo, “Kanban in software engineering: A systematic mapping study,” J. Syst. Softw., vol. 137, no. November, pp. 96–113, 2018.

K. Krishnaiyer and F. F. Chen, “A Cloud-based Kanban Decision Support System for Resource Scheduling & Management,” Procedia Manuf., vol. 11, no. June, pp. 1489–1494, 2017.

K. Krishnaiyer, F. F. Chen, and H. Bouzary, “Cloud Kanban Framework for Service Operations Management,” Procedia Manuf., vol. 17, pp. 531–538, 2018.

A. S. T. Sofan Tohir, K. Kusrini, and S. Sudarmawan, “Implementasi Pengembangan Sistem Model Water Fall Untuk Data Warehouse Akademik,” Intensif, vol. 1, no. 2, p. 108, 2017.

L. S. Helling, “Perancangan Sistem Informasi Pelayanan Pelanggan Pada Citra Laundry Bogor,” INTENSIF J. Ilm. Penelit. dan Penerapan Teknol. Sist. Inf., vol. 2, no. 1, p. 68, 2018.

M. Kumar, S. Kumar Singh, and R. K. Dwivedi, “A Comparative Study of Black Box Testing and White Box Testing Techniques,” Int. J. Adv. Res. Comput. Sci. Manag. Stud., vol. 3, no. 10, pp. 32–44, 2015.

A. Tregubov and J. A. Lane, “Simulation of Kanban-based scheduling for systems of systems: Initial results,” Procedia Comput. Sci., vol. 44, no. C, pp. 224–233, 2015.

S. Susanto, B. Priyatna, and F. Aditya Permana, “Teacher Monitoring Application in Teaching Based on CodeIgniter Framework in High Schools,” Buana Inf. Technol. Comput. Sci. (BIT CS), vol. 1, no. 1, pp. 12–15, 2020.

N. M, A. Nagaraj, H. Gattu, and P. K. Shetty, “Research Study on Importance of Usability Testing/ User Experience (UX) Testing,” Int. J. Comput. Sci. Mob. Comput., vol. 310, no. 10, pp. 78–85, 2014.

Downloads

PlumX Metrics

Published

2020-08-19

How to Cite

[1]
M. A. Ilmi, F. Pradana, and W. Hayuhardhika Nugraha Putra, “Software Project Management Systems Using Kanban Method in the CV. Primavisi Globalindo”, INTENSIF: J. Ilm. Penelit. dan Penerap. Tek. Sist. Inf., vol. 4, no. 2, pp. 215–231, Aug. 2020.