“PLANNING PRODUCTION COST REDUCTION FOR AMINO ACIDS USING SWOT AND TOWS ANALYSIS AT PT. ABC”. 2024. Nusantara of Engineering (NOE) 7 (2): 110-19. https://doi.org/10.29407/noe.v7i02.22902.