PENERAPAN METODE AGE REPLACEMENT PADA USULAN JADWAL PREVENTIVE MAINTENANCE MESIN DUMP TRUCK DI PT. BSE BAYUNG LENCIR. (2023). Nusantara of Engineering (NOE), 6(1), 57-65. https://doi.org/10.29407/noe.v6i1.19871