[1]
Dio, A.D., MZ, hermanto and tamalika, tolu 2023. PENERAPAN METODE AGE REPLACEMENT PADA USULAN JADWAL PREVENTIVE MAINTENANCE MESIN DUMP TRUCK DI PT. BSE BAYUNG LENCIR. Nusantara of Engineering (NOE). 6, 1 (Apr. 2023), 57 - 65. DOI:https://doi.org/10.29407/noe.v6i1.19871.