[1]
2024. PLANNING PRODUCTION COST REDUCTION FOR AMINO ACIDS USING SWOT AND TOWS ANALYSIS AT PT. ABC. Nusantara of Engineering (NOE). 7, 2 (Oct. 2024), 110–119. DOI:https://doi.org/10.29407/noe.v7i02.22902.