[1]
I. N. Rohman, R. Setiawan, and I. N. Gusniar, “Analysis of Reducing Loss Time in The Stamping Process in The AIDA 800 T Blanking Machine at PT. XYZ”, JMN, vol. 6, no. 1, Jul. 2023.