[1]
Mubarak, H., Mahmuddin, M., Sungkono, S. and Arham, M. 2024. Efficiency of Boiler and Steam Turbine for Power Plant Unit 2 PT. XYZ. Jurnal Mesin Nusantara. 7, 1 (Jun. 2024), 49–62. DOI:https://doi.org/10.29407/jmn.v7i1.21676.